Blackthorn Resources Limited [BTR] - MUMBWA JV PROJECT: INCORRECT GOLD GRADE REPORTED IN MUMBWA DRILL HOLE MUM0008BD Blackthorn Resources provide the following project update regarding a significant inaccuracy identified in the reporting of gold assays in a Mumbwa Phase 4 exploration drill hole. Assay results for drill hole MUMM0008BD were reported to the ASX on 20 October 2010, indicating significant gold mineralisation, including 14.09 g/t Au over an 8m drilled thickness interval between 1,081m and 1,089m depth. Re analysis of the mineralised interval in this hole has failed to repeat and confirm the high grade assays originally reported. It now appears that these results are incorrect and that the actual gold grade is very low. A full investigation into the reasons for the analytical discrepancy and the failure to report critical information to BHP Billiton is being undertaken. Fortbridge.NET is a specialist web-based service for clients ("Issuer") of Fortbridge Consulting Pty Ltd. DISCLAIMER: The message and attachment issued with this email may contain "forward-looking statements", which are projections that reflect the Issuer`s reasonable beliefs based on information currently available. Fortbridge is a Public Relations consultancy. PRIVACY: You have been regarded as a relevant contact through research. Please consider the environment before printing this document.
|
||||||||||||
|