If you have trouble seeing this e-mail, please click here:
Add to your address book or safe list to ensure delivery of email blasts (click for instructions)
Rye Patch Gold Drills 44.5 G/T AU and 36.3 G/T AG Over 1.5 Metres At Wilco
Vancouver, British Columbia, June 7, 2010 - Rye Patch Gold Corp (TSX-V: RPM; OTC:RPMGF) (Rye Patch or the Company) reports drillhole assays for its spring drilling campaign on the Wilco project in Pershing County, Nevada. Using a 0.343 g/t (0.01 opt) gold cut-off grade, the following Table summarizes drill intercepts for the first six reverse circulation drillholes.
TABLE1: WILCO PROJECT: 2010 REVERSE CIRCULATION DRILL PROGRAM (WR-095 to WR-100)
Drillhole
Target
Au
Ag
Drillhole interval
From
To
TD
Area
g/tonne
g/tonne
metres
metres
metres
(metres)
WR-095
North Area
0.43
3.6
16.8
67.1
83.8
373.4
WR-095
North Basin
0.35
2.3
3.0
88.4
91.4
WR-095
North Basin
0.36
3.9
3.0
93.0
96.0
WR-095
North Basin
0.39
4.5
3.0
112.8
115.8
WR-095
North Basin
3.24
4.0
6.1
118.9
125.0
Including
6.31
5.3
3.0
120.4
123.4
WR-095
North Basin
2.08
12.7
15.2
301.8
317.0
Including
3.54
39.8
1.5
303.3
304.8
Including
5.90
25.7
3.1
312.4
315.5
WR-096
North Basin
0.44
2.8
9.1
80.8
89.9
381.0
WR-096
North Basin
0.43
2.5
12.2
93.0
105.2
WR-096
North Basin
0.44
2.1
4.6
109.7
114.3
WR-096
North Basin
0.47
5.1
3.0
349.0
352.0
WR-097
North Basin
0.41
2.7
16.8
70.1
86.9
390.1
WR-097
North Basin
0.47
2.5
13.7
100.6
114.3
WR-098
North Basin
0.36
2.9
3.0
239.3
242.3
379.0
WR-098
North Basin
3.24
3.2
3.0
315.5
318.5
Including
6.33
4.9
1.5
315.5
317.0
WR-098
North Basin
1.24
6.5
30.5
332.2
362.7
Including
3.34
4.9
1.5
335.3
336.8
WR-099
North Basin
0.43
7.8
12.2
123.4
135.6
385.6
WR-099
North Basin
0.48
5.4
4.6
303.3
307.8
WR-099
North Basin
11.67
12.0
6.1
310.9
317.0
Including
44.53
36.3
1.5
312.4
313.9
WR-099
North Basin
2.68
36.8
3.0
356.6
359.7
WR-099
North Basin
1.17
5.0
6.1
373.4
379.5
WR-100
North Basin
0.40
3.8
3.0
123.4
126.5
396.2
WR-100
North Basin
1.39
2.1
3.0
382.5
385.6
These drill results demonstrate an expansion of the high-grade zone in the North Basin target. Given our existing extensive Nevada resource inventory; the expansion potential of the Oreana trend and the Companys unique networking capability, Rye Patch has a clear path to meet its corporate resource inventory objectives, commented WilliamC.(Bill) Howald, the Companys CEO and President.
Drillholes WR-081, and WR-087, drilled in 2008, along with drillholes WR-09