🕐02.04.12 - 19:27 Uhr

NORTHERN VERTEX HITS MULTIPLE HIGH-GRADE GOLD INTERCEPTS AS DRILLING SUCCESS CON
TINUES ON WESTERN EXTENSION OF MOSS GOLD-SILVER PROJECT



If you have trouble seeing this e-mail, please click here

Add to your address book or safe list to ensure delivery of email blasts (click for instructions)

Northern Vertex Hits Multiple High-Grade Gold Intercepts as Drilling Success
Continues on Western Extension of Moss Gold-Silver Project

Click Here for a Free Real-time Stock Quote on TSX-V: NEE

VANCOUVER, April 2, 2012 - Northern Vertex Mining Corp. (TSX.V:NEE) (OTCQX:NHVCF) is pleased to announce results from core holes 5 through 10 as part of a Phase II, 20,000 foot (6500 meter) infill drill and resource expansion program to test the western extension of the Moss stockwork Gold-Silver vein system in Mohave County, Northwestern Arizona.

States Northern Vertex Chief Geologist Dr. Bob Thompson, "We are very pleased with current results. Five out of 6 drill holes returned high-grade intercepts including: 6.26 gpt Gold Equivalent1 over 1.68 meters, 5.37 gpt Gold eqv over 1.83 meters, 4.03 gpt Gold eqv over 1.22 meters and 3.61 gpt Gold eqv over 4.57 meters. Results confirm the Gold mineralization along Mosss western extension is expanding and robust. Significantly, the high-grade zones are contained within larger mineralized intersections which are above internal cut-off grades and are expected to play a key factor in adding additional tonnage and ounces to our current 43-101 Gold-Silver resource."

To date, the Company has completed 28 holes of its Phase II in-fill drill and resource expansion program to test the western extension of the Moss Gold-Silver project. Included in the total are 18 RC drill holes and 10 diamond drill (core) holes. The Company reports Phase II drilling on the western extension is now complete. Results from the final holes of the program are expected in the near future.

MetricImperial Hole Intvl AuEq1 From To Au Ag True Width2Intvl AuEq1 True Width2 (m) (gpt) (m) (m) (gpt) (gpt) (m)(ft) (opt) (ft) AR-143C 13.72 0.52 5.49 19.20 0.39 5.3 Unknown � 45.0 0.015 Unknown incl. 1.52 2.28 13.11 14.63 1.53 29.7 Unknown � 5.0 0.066 Unknown AR-143C 1.52 0.54 25.30 26.82 0.48 2.4 Unknown � 5.0 0.016 Unknown AR-143C 7.62 0.34 29.87 37.49 0.26 3.1 Unknown � 25.0 0.010 Unknown AR-143C 21.18 0.51 42.06 63.25 0.40 4.2 Unknown � 69.5 0.015 Unknown AR-143C 21.34 0.90 69.49 90.83 0.54 14.1 Unknown � 70.0 0.026 Unknown incl. 1.68 6.26 86.26 87.93 3.10 126.2 Unknown � 5.5 0.182 Unknown AR-143C 1.52 0.50 96.93 98.45 0.34 6.4 Unknown � 5.0 0.014 Unknown AR-143C 3.05 0.46 104.55 107.59 0.43 1.4 Unknown � 10.0 0.013 Unknown AR-149C 11.40 1.08 0.00 11.40 0.75 13.3 10.90 � 37.4 0.031 35.8 incl. 1.37 3.01 2.96 4.33 2.30 28.6 1.31 � 4.5 0.088 4.3 AR-149C 0.76 0.41 23.16 23.93 0.29 4.5 0.73 � 2.5 0.012 2.4 AR-149C 2.74 0.37 41.76 44.50 0.33 1.6 2.62 � 9.0 0.011 8.6 AR-149C 1.52 2.50 60.05 61.57 2.28 8.6 1.46 � 5.0 0.073 4.8 AR-151C 15.85 0.44 11.89 27.74 0.33 4.1 14.12 � 52.0 0.013 46.3 AR-152C 23.01 0.38 15.09 38.10 0.30 3.2 14.79 � 75.5 0.011 48.5 AR-152C 10.21 0.34 42.37 52.58 0.27 2.7 6.56 � 33.5 0.010 21.5 AR-152C 77.72 0.66 58.83 136.55 0.51 6.1 49.96 � 255.0 0.019 163.9 incl. 4.57 3.61 60.35 64.92 2.19 57.0 2.94 � 15.0 0.105 9.6 AR-154C 14.94 0.35 29.87 44.81 0.32 1.1 7.91 � 49.0 0.010 26.0 AR-154C 15.24 0.40 57.30 72.54 0.38 1.0 8.08 � 50.0 0.012 26.5 AR-154C 1.22 0.43 83.52 84.73 0.42 0.4 0.65 � 4.0 0.013 2.1 AR-154C 76.20 0.62 90.83 167.03 0.52 3.8 40.38 � 250.0 0.018 132.5 incl. 1.83 5.37 160.02 161.85 5.27 4.0 0.97 � 6.0 0.157 3.2 AR-154C 1.52 0.39 189.89 191.41 0.21 7.0 0.81 � 5.0 0.011 2.6 AR-154C 1.83 0.46 195.99 197.82 0.28 6.9 0.97 � 6.0 0.013 3.2 AR-154C 1.52 0.41 203.61 205.13 0.29 5.1 0.81 � 5.0 0.012 2.6 AR-154C 1.22 0.41 210.01 211.23 0.38 0.9 0.65 � 4.0 0.012 2.1 AR-154C 0.91 0.38 212.45 213.36 0.27 4.3 0.48 � 3.0 0.011 1.6 AR-156C 15.24 0.41 7.92 23.16 0.30 4.1 9.17 � 50.0 0.012 30.1 AR-156C 1.22 4.03 40.84 42.06 0.16 154.8 0.73 � 4.0 0.118 2.4 AR-156C 1.52 0.40 49.68 51.21 0.37 0.9 0.92 � 5.0 0.012 3.0 AR-156C 4.57 0.32 52.73 57.30 0.29 1.1 2.75 � 15.0 0.009 9.0

1 AuEq (gpt) = Au (gpt) + 1/40 x Ag (gpt)
2 True Width estimated using 70 degree dip to zones of mineralization
opt = troy ounces / short ton (2000 lbs)
gpt = grams / metric tonne (1000 kg)

The geological disclosure in this press release has been reviewed and verified by Northern Vertexs Chief Geologist, Dr. Bob Thompson, PhD P.Eng (a qualified person for the purpose of National Instrument 43-101, Standards of Disclosure for Mineral Projects).

All analyses were performed by Inspectorate America, Reno, using industry standard protocols. For full QC/QA procedures please visit

Northern Vertex has the right to earn a 70% interest in the historic Moss Gold-Silver Property located in Mohave County, Arizona from Patriot Gold Corp. Subsequent to the Northern Vertex earn-in, financing of project will be on a proportional basis.

About Northern Vertex: Northern Vertex is a gold exploration and development company operating principally in the United States and Canada. The Company comprises an experienced management group with a strong background in all aspects of acquisition, exploration, development and financing of precious metal mining projects. The Companys stated mandate is to acquire, develop and advance gold projects that demonstrate near term production potential and long-term sustainable growth.

ON BEHALF OF THE BOARD OF NORTHERN VERTEX

"Joseph Bardswich"

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or the accuracy of this release.

Cautionary Note to US Investors: This news release may contain information about adjacent properties on which we have no right to explore or mine. We advise U.S. investors that the SECs mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

Click here for contact information

Click Here for a Free Real-time Stock Quote on TSX-V: NEE



Disclaimer: Vantage Communications Ltd. was paid to distribute this bulletin.
Vantage Communications may or may not own securities in this particular company.
THIS IS NOT A RECOMMENDATION TO BUY OR SELL ANY SECURITY!
You are on this mailing list because you registered for VantageWire News.
Past performance of Companies mentioned does not guarantee future performance.

If you would like to opt out click here.

For more information about this service, please contact
Vantage Communications Ltd. at 1.800.574.0901
Suite 150 - 666 Burrard St, Vancouver, British Columbia V6C 2X8

This email complies with the US Federal CAN-SPAM Act of 2003

 




Products & Services | Jobs