🕐13.01.12 - 18:54 Uhr

LIM REPORTS PRELIMINARY OPERATING RESULTS FOR 2011






LIM Reports Preliminary Operating Results for 2011

Click Here for a Free Real-time Stock Quote on TSX: LIM

TORONTO, ONTARIO--(Jan. 13, 2012) -Labrador Iron Mines Holdings Limited(TSX:LIM) is pleased to report preliminary unaudited operating results for the period to December 31, 2011 from its James direct shipping (DSO) iron ore project near Schefferville, Quebec.

These operating results reflect the period beginning June 1, 2011 with the commencement of mining operations at the James Mine and commissioning and start-up of the Silver Yards processing plant. This is considered to be a pre-production, start-up and testing period. Commercial production for the Schefferville Project is expected to be declared in 2012.

Operating Results by Quarter and Year to Date Quarter ended
December 31, 2011 Quarter ended
September 30, 2011
YTD June 1 to
December 31, 2011
Tonnes Grade %
Fe Tonnes Grade %
Fe Tonnes Grade %
Fe Total Ore Mined 483,629 60.9 612,596 60.2 1,205,609 60.7 Direct Railing Ore portion 226,372 64.8 177,863 65.3 438,441 64.9 Waste Mined 592,957 -- 1,536,368 -- 2,855,007 -- Ore Processed 171,842 59.0 382,013 57.4 572,052 58.4 Lump Ore Produced 20,572 63.7 57,179 64.8 79,407 63.6 Sinter Fines Produced 47,825 65.0 101,002 63.0 152,735 65.0 Total Product Railed 349,624 64.8 208,461 65.1 563,569 64.9 Tonnes Product Sold 385,898 64.9 --



Products & Services | Jobs