🕐22.11.11 - 16:27 Uhr

MINERAL MOUNTAIN RESOURCES LTD. CONTINUES TO INTERSECT HAMMOND REEF STYLE GOLD M
INERALIZATION AT PINE CENTRE



Cant read this email? View it online

Add to your address book or safe list to ensure email delivery


 


November 22, 2011

Mineral Mountain Resources Ltd.

Continues to Intersect Hammond Reef Style Gold Mineralization at Pine Centre

- Current drilling intersects 1.57 g/t Au over 14.00 metres, 1.96 g/t Au over 12.00 metres

- Exploratory drilling to test other gold targets within the marginal phase of the Lawrence Lake Batholith is ongoing

VANCOUVER, BC - Mineral Mountain Resources Ltd. ("Mineral Mountain" or the "Company") (TSX-V:MMV) (OTCQX:MNRLF) is pleased to announce gold assays from its ongoing exploratory drilling campaign in the Pine Centre Area of its Straw Lake Project, situated approximately 50 km north of Fort Frances in northwestern Ontario.

Current Drilling Campaign

Drilling assays for the ongoing Phase I campaign at the Pine Centre area of the Companys 100% owned Straw Lake Project have been received for an additional 15 drillholes, of which 10 drillholes (PC11-026-PC11-035) targeted the main Pine Center Zone.

The remaining 5 drillholes (PC11-036-PC11-041) are interpreted to have tested a parallel structure.

This initial phase of drilling was designed to confirm historically drilled mineralization and also to test the northeast strike extensions of the gold mineralization hosted in the PCAZ.

Notable intersections include:  PC-11-032 (1.57 g/t Au over 14.00 metres), PC-11-033 (1.96 g/t Au over 12.00 metres), and PC-11-026 (1.65 g/t Au over 13.20 metres). Complete length weighted gold composites are presented in Table 1.

A drill hole location plan map is available on the Companys website at www.mineralmtn.com.

Table 1: Length weighted gold averages from current drilling at Pine Centre Alteration Zone (PCAZ).

Core lengths equal approximately 90-100% of true thicknesses.

Drill holes PC11-036 through to PC11-041 are not interpreted to lie on the PCAZ.

HOLE-ID

SECTION

ELEVATION (M)

FROM (M)

TO (M)

CORE LENGTH (M)

AU (G/T)

ZONE









PC11-026

476049

384

6.80

20.00

13.20

1.65

PCAZ

PC11-027

476052

382

9.00

17.20

8.20

2.43

PCAZ

PC11-028

476061

390

3.00

14.00

11.00

1.45

PCAZ

PC11-029

476063

388

3.60

16.00

12.40

1.27

PCAZ

PC11-031

476107

364

27.30

32.00

4.70

1.56

PCAZ

PC11-031

476102

346

48.00

49.00

1.00

1.18

PCAZ FW

PC11-032

476082

372

22.00

36.00

14.00

1.57

PCAZ

PC11-032

476073

359

45.70

46.24

0.54

1.18

PCAZ FW

PC11-033

476090

367

23.00

35.00

12.00

1.96

PCAZ

PC11-034

476125

369

29.00

37.00

8.00

0.91

PCAZ

PC11-035

476134

361

31.00

40.00

9.00

2.34

PCAZ

PC11-036

476169

393

14.00

20.00

6.00

0.61


PC11-037

476174

392

13.00

17.00

4.00

0.61


PC11-037

476169

376

32.00

32.50

0.50

1.32


PC11-037

476167

369

39.56

40.00




Products & Services | Jobs