🕐12.10.11 - 21:27 Uhr

GOLDWORLDRESOURCES - GOLD WORLD RESOURCES DIRECT SHIPPING MATERIAL TEST WORK RESULTS



Dear Subscriber to Gold World Resources news,
Attached please find our Press Release of October 12, 2011.

Please do not hesitate to contact us if you would like to have more information.
Best regards, Roswitha
Gold World Resources Inc. 1200 - 330 Bay Street Toronto / ON M5H 2S8 Tel.: 416.594.9888 Fax: 416.594.1967
Press Release
Gold World Resources Direct Shipping Material Test Work Results
TORONTO, October 12, 2011 Gold World Resources Inc.

(TSXV: GDW) or ("the "Company") is pleased to announce receipt of the SGS Metallurgical Laboratory ("SGS") draft report with results of test work on the 47 Trench ("47-Tr") Direct Shipping Material(see news releases dated July 20 and August 18, 2011) from its Mount Anderson Yukon Project.


Test work results are very encouraging since most of the Au and Ag recovered are in the coarse fraction and also upgraded by low cost processing by crushing and sieving.
Results received upon screening of 2 test samples of 20 kg each from 435.7 kg dry weight of the 47-Tr material, crushed to nominal 2", screened to +1", and to +3/8 inch finer fraction:
1" size fraction 3/8" to - 1" size fraction
20 kg Samples % of Au in fraction g/t Au % of Ag in fraction g/t Ag % of Au in fraction g/t Au % of Ag in fraction g/t Ag
Sample 1 56.1% 12.3 g/t 51.2 % 2,100 g/t 18.7% 8.35 g/t 22.8% 583 g/t
Sample 2 68.4% 35.7 g/t 53.1% 929 g/t 20.7% 20.6 g/t 23.3% 2180 g/t
Each of the size fractions was assayed for Au, Ag, Zn, Pb, and S with results from 44.6 % to 55.0% of the Pb also reported to the +1" fraction which had respective assays of 14.9 % and 23.2% Pb.
The purpose of the test work was to determine an average grade for constituent elements for providing to prospective buyers to obtain indicative smelting terms and to determine the degree to which the material would be upgraded by simple crushing and screening.


The Company is in discussions with smelter representatives and has approximately 1.5 t stored near the 47 Tr for a smelter test run.

The material was excavated by a previous property owner and was re-bagged during this years exploration work.

..

(please see attachment)



Products & Services | Jobs