🕐21.09.10 - 05:00 Uhr

GGA drills 105.51 g/t Gold Intercepted Over 1.72 Metres





105.51 g/t Gold Intercepted Over 1.72 Metres at San Jos� de Gracias Tres Amigos

Click here for a free real time quote of Goldgroup Mining Inc.

Vancouver, British Columbia (September 20, 2010) - Goldgroup Mining Inc. ("Goldgroup" or the "Company"), in coordination with DynaResource, Inc. ("DynaUSA"-"DYNR-OTCBB"), is pleased to announce that drilling from the final 32 holes of the latest 15,600 meter 62 hole diamond drilling program at the San Jos� de Gracia project in Sinaloa, Mexico ("San Jos� de Gracia") has encountered significant mineralization yielding 105.51 g/t Au over 1.72 metres plus many intercepts above the 2.0 g/t Au cut-off grade including 19.80 g/t Au over 5.27 metres. Significant assay results from the remaining 32 holes in the program (SJG-10-157 to SJG-10-188), drilled in the Tres Amigos, La Union, Purisima and La Prieta veins, are presented in the tables below:

TRES AMIGOS VEIN Drill Hole Mineralization From (m) To (m) Interval (m) Au grade (g/t) SJG-10-165 299.15 305.70 6.55 2.90 SJG-10-175 135.93 140.00 4.07 3.41 and 149.50 150.67 1.17 2.05 and 241.59 245.40 3.81 6.37 and 314.50 315.90 1.40 3.12 SJG-10-176 221.04 228.91 7.87 2.00 including 224.27 228.91 4.64 2.82 SJG-10-177 158.73 159.13 0.40 2.43 and 207.05 208.36 1.31 2.81 and 219.01 219.73 0.72 5.90 and 228.63 245.00 16.37 10.58 including 228.63 233.90 5.27 19.80 including 239.52 245.00 5.48 12.47 SJG-10-178 110.45 111.25 0.80 3.83 and 222.55 233.45 10.90 4.22 and 327.85 328.45 0.60 8.84 SJG-10-179 75.3 77.02 1.72 105.51 and 174.85 179.52 4.67 5.70 and 191.70 194.00 2.30 4.79 SJG-10-181 100.50 102.00 1.50 2.88 SJG-10-182 183.58 184.20 0.62 3.35 and 192.80 193.81 1.01 2.85 and 245.58 246.05 0.47 2.29

LA UNION VEIN Drill Hole Mineralization From (m) To (m) Interval (m) Au grade (g/t) SJG-10-159 55.80 56.35 0.55 9.97 PURISIMA VEIN Drill Hole Mineralization From (m) To (m) Interval (m) Au grade (g/t) SJG-10-161 92.08 96.01 3.93 8.43 SJG-10-186 73.40 74.40 1.00 2.58 and 92.10 93.45 1.35 14.73 SJG-10-188 191.00 191.90 0.90 2.41 LA PRIETA VEIN Drill Hole Mineralization From (m) To (m) Interval (m) Au grade (g/t) SJG-10-169 28.75 32.13 3.38 9.11 SJG-10-171 11.70 12.30 0.60 2.90 SJG-10-172 137.35 138.45 1.10 4.47 SJG-10-173 93.30 94.60 1.30 2.49 SJG-10-174 75.35



Products & Services | Jobs